Pink-orange jacket and hat
size: 62/68; 74/80; 86/92.
The necessary materials:
– Each 100/100/150 g of orange and white thread (60 % lana, 40% polyacryl, 175 m/50g);
– 50/50/100 g pink yarn (60 % lana, 40% polyacryl, 175 m/50g);
– Andrele no. 3.5 and no. 5;
– 2 buttons;
– 40 cm pink satin ribbon.
Thread density: 25 stitches x 40 rows = 10 x 10 cm.
The vertical model: * 4 rows jersey stitch with pink thread, 4 rows lazy stitch with white thread, 4 rows jersey stitch with orange thread, 4 rows lazy stitch with white thread, repeat from *.
The "Chessboard" model: In rows 1, 3, 5, 7 All stitches will knit the front, In rows 2 and 4, 2 front stitches will be knitted, 2 purl stitches until the end of the row, and in rows 6 and 8, 2 back stitches will be knitted, 2 front meshes. Repeat rows 1-8.
Hoods : 2 stitches together face, 1 life.
Row with jets:* 2 stitches together front, 1 life, repeat from *.
The jacket:
Spate: It is mounted on the andrea with orange thread 72/76/88 stitches and the "Chessboard" pattern will be knitted between the edge stitches.
After 12/14/17 cm from the first row, for the sleeve trimming, 1x 8 stitches will end on both sides.
After 22/26/31 cm from the first row, For the neck crochet, 24/24/30 stitches will be closed from the center and each side will be knitted separately. In every second row, from the edge of the neck crossing, 1×2 and 1×1 eye.
After 24/28/33 cm from the first row, the remaining stitches for the shoulder will be closed.
Front right side: It is mounted on the andrea with orange thread 8 stitches and the "Chessboard" pattern will be knitted between the edge stitches. In every 2nd row on the andrea will be additionally mounted from the right side 5/11/14 x 3 stitches, 6/2/1 x 4 stitches and 1 x 8 stitches. After 6/7/8 cm from the first row, an opening will be made: After 22/24/28 stitches from the left edge the work will be divided in two and each part will be knitted separately. After 4 cm knit, the stitches of both sides will knit together.
After 8/9/10 cm from the first row, From the right side, a keyhole will be made on meshes 4 and 5.
After 10/11/12 cm from the first row, for cutting the neck, from the right side, 1 x 8 stitches will be subtracted and in each 2nd row 26/26/28 x 1 stitch.
From the left side, the sleeve will be cut in the same way as on the back and at the same length.
After 24/28/33 cm from the first row, the remaining stitches for the shoulder will be closed.
The left front side will be knitted symmetrically with the right side.
Sleeve: It is mounted on the weave with white thread 44/49/54 stitches and it will be knitted 3 rows of lazy stitch, after which the vertical pattern will be knitted between the edge stitches.
In every 8th row on both sides, 2/2/0 x 1 eye will be added and in every 6th row 8/11/16 x 1 eye.
After 16/20/23 cm from the first row, another 3 cm will be knitted straight and then the stitches will end.
finishing: Sew all the details of the jacket. From the edges of the right and left sides of the front, The lower edges of the jacket will be mounted on Andrea Meshes and 3 rows of lazy stitch will be knitted with white yarn, after which the stitches will close. Buttons are sewn.
headpiece.
It is mounted on the beam with white wire (the thread should be in two) 72/80/88 stitches. The stitches are divided equally on 4 tights and will be knitted in a circular 2 cm elastic stitch (2 front stitches, 2 purl stitches), after that will knit jersey point. After 7/8/9 cm from the headband, the subtractions will be made as follows: Row 1 circular: each 8th + 9th eye / each 9th + 10th eye / each 10th + 11th eye will knit together face. These subtractions will be made above the first row another 2/3/4 times in every 4th row = 48 stitches.
After 14/15/16 cm from the headband, a circular row will be knitted with jets.
After 16/17/18 cm from the headband, 4 more circular rows of elastic stitch will be knitted, after that the stitches end.
On the hat will be embroidered flowers of different colors, The center of the popcorn will be sewn by folding the "knot" seam. The ribbon will be passed through the row with jets and tightened.