The jacket, scarf and hat
size: 56/62;68/74;80/86
The necessary materials:
– 300/350/350 g dark blue thread (72% polyacryl, 28% lana, 104 m/50g);
– 50 g each of purple and white thread (40% polyacryl, 35% chlorofibre, 25% lana, 136m/50g);
– Andrele no. 4.5 and no. 5;
– Zipper;
Thread density: 15 stitches x 22 rows = 10 x 10 cm.
The jacket:
Spate: It is mounted on Andrea with colored wire dark blue 38/44/50 stitches and knit 3 cm * 5 knit stitches, 1 ochi two*, adding in the last row at equal intervals 3 stitches. After that, between the edge stitches will knit jersey point.
After 9/13/15 cm from the headband, for cutting the sleeves, will close from both sides 1 x 2 stitches and every 2nd row 2 x 1 stitch.
After 21/27/31 cm from the headband, for the shoulder line will end from both sides 1 x 4/5/6 stitches and in row 2 – 1 x4/5/5 stitches.
Simultaneously with the beginning of the shoulder line, the neckline will be performed, ending the 17/19/23 stitches from the center and each side will be knit separately.
After 22/28/32 cm from the headband all stitches must be closed.
Front right side: Mount on needle with thread dark blue color 20/20/26 stitches and knit 3 cm * 5 knit stitches, 1 ochi two*, adding last row at equal intervals 1/4/1 stitches. After that, between the edge stitches will knit jersey point.
After 9/13/15 cm from the headband, for cutting the sleeves, will close from the left side 1 x 2 stitches and in every 2nd row 2 x 1 stitch.
After 21/27/31 cm from the headband, for the shoulder line will end from the left side 1 x 4/5/6 stitches and in row 2- 1 x4/5/5 stitches.
After 17/22/26 cm from the headband, the neckline will be made, ending from the right side 1 x 3/4/4 stitches and every 2nd row 2/2/3 x 2 stitches and 2 x 1 stitches.
After 22/28/32 cm from the headband all stitches must be closed.
The left front side will be knitted symmetrically with the right side.
Sleeve: Mount on needle with thread dark blue color 26/26/32 stitches and knit 3 cm * 5 knit stitches, 1 ochi two*, adding last row at equal intervals 1/4/1 stitches. After that, between the edge stitches will knit jersey point. In every 6th row will be added from both sides 0/3/2 x 1 stitch and in every 4th row 5/3/6 x 1 stitch.
After 10.5/15.5/18.5 cm from the headband will end from the parts abele 1 x 4/5/5 stitches and in every 2nd row 1 x 3, 1×2, 1 x 4 stitches/1×3 and 2 x 4 stitches/1 x 5, 1x 4 and 1 x 5 stitches.
After 14.5/19.5/22.5 cm from the headband will end the remaining stitches.
finishing: Sew all the details of the jacket. From the edge of the neckline is mounted on circular knitting needles 45/53/57 stitches with dark blue thread, will knit 1 row back with all the stitches front and 2 cm * 3 knit stitches, 1 ochi two*. After the stitches will end and will sew the zipper.
scarf: Mount on needle with thread dark blue color 27 stitches and knit jersey point between edge stitches. After 90/95/100 cm from the first row the stitches end.
The scarf bends in two lengthwise and sews. On one end of the scarf will sew a car, applying the stitch "needle forward" with purple and white thread.
Caciula: Mount on needle with thread dark blue color 58/66/70 stitches and knit 3 cm * 3 knit stitches, 1 ochi two*, adding in the last row at equal intervals 2/2/1 stitches. After that, between the edge stitches will knit jersey point.
After 8/10/10 cm from the headband, the following decreases are made:
For size 1: Row 1: 1 edge stitch, * 5 knit stitches, 2 stitches together face, 5 stitches face, 2 stitches together face, 6 stitches face, 2 stitches together face, 5 stitches face, 2 stitches together face, repeat from * once, 1 edge stitch.
For size 2: Row 1: 1 edge stitch, * 6 front stitches, 2 stitches together face, 5 stitches face, 2 stitches together face, 5 stitches face, 2 stitches together face, repeat from * 2 times, 1 edge stitch.
For size 3: Row 1: 1 edge stitch, * 6 eyes girl, 2 stitches together face, 6 stitches face, 2 stitches together face, 5 stitches face, 2 stitches together face, repeat from * 2 times, 1 edge stitch.
These decreases are repeated in every 2nd row 6 times, above the subtractions in row 1, after that in the next 2nd row will knit each 2 stitches together front.
Through the remaining stitches pass the working thread. The thread is drawn and passed on the back side of the work, executing the back stitch of the hat.
After the headband, in the 2nd row knitting jersey point will sew with white thread a line, applying the stitch "needle forward". The thread will pass over 2 stitches and under 1/2 stitch.
After the headband, in the 3rd row knitting jersey point will sew with purple thread a line, applying the stitch "needle forward". The thread will pass over 2 stitches and under 1/2 stitch.